How Much Is a Yard of Concrete in 2026? Installed Cost, Coverage and What the Plant Charges

Written by the LocalServiceHQ editorial team · Prices checked October 2026 · Sources: our price index, published cost guides and supplier list prices

At our October 2026 index, concrete poured as a 4-inch slab costs about $486 to $1,215 per cubic yard installed, with a typical figure near $729. That is not the same as the delivered material price: a ready-mix plant quotes the concrete per yard and then adds fees, while an installed price includes forming, finishing and labour. One yard covers about 81 square feet at 4 inches deep, which is the conversion most homeowners actually need.
Key numbers

What one cubic yard actually covers

A cubic yard is 27 cubic feet. Spread it at a given depth and it covers an area: at 4 inches, which is one third of a foot, one yard covers 27 divided by 0.333, or 81 square feet. That single conversion explains why concrete is sold by the yard but planned in square feet.

Slab depthCoverage per yardCommon use
4 inches81 sq ftPatios, walkways, shed floors
5 inches64.8 sq ftDriveways with light vehicles
6 inches54 sq ftDriveways, heavy vehicles, garage floors

If you know the square footage and the depth, the concrete calculator does the division and adds the waste allowance. If you already have the yardage, the depth is what decides how far it goes.

The per-yard price, three ways to read it

Two quotes can both say "concrete, $X per yard" and mean completely different things. Ask which of the three bases the number uses before you compare.

BasisWhat it includesHow to compare it
Delivered materialReady-mix delivered to the site, before any placement labourCompare with another plant quote for the same mix, volume and distance
Installed slabMaterial, forming, placement, finishing, curing and often haulingCompare with installed cost per square foot on the concrete guide
Yard-equivalent installedInstalled cost converted back to a per-yard figureUseful for a quick check, not for comparing with a plant quote

Yard-equivalent installed figures above use the price index range of $6 to $15 per square foot installed, multiplied by 81 square feet per yard at 4 inches. They are estimates, not quotes.

Why the delivered price per yard moves

Ready-mix is a perishable product with a short window, so the plant prices it on the day. Four things move the number more than anything else a homeowner can control.

The mix and the strength

A 3,000 PSI mix for a patio is not the same price as a 4,500 PSI mix with air entrainment for a driveway in a freeze-thaw climate. Additives such as accelerators, retarders or fibres add a line to the bill.

The order size and the plant minimum

Plants price small orders differently because the truck and the batch plant have a minimum. Ordering two yards can carry a charge that a full load does not, which is why a small patio sometimes costs more per square foot than a large driveway. The delivery fees guide breaks those charges down.

Distance and access

Delivery distance and site access decide how long the truck is committed. A site where the truck can back up to the pour is cheaper than one where concrete must be pumped or wheeled.

Timing

Early starts, Saturday pours and after-hours work can carry scheduling charges. A pause in the schedule for the crew to finish forming is billed as wait time.

What a concrete invoice looks like, line by line

The exact layout differs by plant, but a delivered concrete bill usually contains the same categories. Use this list to check that every number has a home before you pay.

Material - mix description, PSI, yards ordered, price per yard, total yards delivered.

Delivery - distance or zone charge, and any stated minimum load.

Fees - short-load, wait time, Saturday or after-hours, environmental or fuel surcharge. Each should be named, not bundled.

Add-ons - fibres, accelerator, colour, pump fee if used.

Tax - sales tax where it applies.

Total and payment terms - due date, method, and who is responsible for the balance.

If a bill arrives as one line and a total, ask for the breakdown before paying. It is also worth checking the yards delivered against the yards billed; the ticket from the truck carries both.

How to lower the bill without cutting the slab

How the price changes from city to city

The concrete itself travels well: a yard of 3,000 PSI mix is broadly the same product in most markets. What changes by city is everything around it. Labour rates move, plant density moves, and the distance from the plant to the site moves. A city with several plants competing on the same day has a different delivered price from a rural area served by one plant.

The other local factor is the rulebook. Some jurisdictions require a permit and an inspection for a driveway or a structural slab, and the inspection adds a step to the schedule. Frost depth changes how deep footings and piers must go, which changes the volume of concrete even when the visible slab is the same size. When you compare your quote with the national numbers, compare the scope first, then the price.

Bags or a truck: the break-even

Ready-mix makes sense when the pour is large enough to justify a truck and the fees that come with it. Bags make sense for small jobs where a minimum load and a short-load fee would dominate the bill. As a rule, fence posts, a shed base and small pads are bag jobs; a driveway, a patio or anything over about a yard is usually a truck job.

The break-even depends on local bag prices and delivery fees, so the arithmetic is worth doing before ordering. Add the delivered price, the short-load fee and any pump fee, then compare that total with the bag price for the same volume. The delivery guide lists the fees to include in that comparison.

Have a per-yard quote? Convert it to a per-square-foot installed figure and compare it with typical prices.

Check the quote

Questions about the price of a yard of concrete

How many square feet does a yard of concrete cover?

About 81 square feet at 4 inches deep, 64.8 at 5 inches and 54 at 6 inches. The number changes with depth because the same volume spreads over a different area.

How many yards do I need for a 20 by 20 slab?

At 4 inches deep, about 4.9 cubic yards before waste and 5.2 with a 5% allowance. The calculation is length times width times depth in feet, divided by 27.

Why is my concrete quote higher than the plant's per-yard price?

Because they measure different things. The plant quotes delivered material. An installed price adds forming, labour, finishing, curing, hauling and often a permit, so the two numbers should not match.

Is a cubic yard the same as a yard of concrete?

Yes, in this trade. A "yard of concrete" means one cubic yard of volume, not a linear yard. Suppliers, calculators and contractors all use the cubic yard.

Does a short-load fee apply to small jobs?

Often, if the order is below the plant's minimum. The fee is usually charged per yard short of the minimum. Ask the plant for the minimum and the fee when you request the quote.

How many bags of concrete are in a yard?

An 80 lb bag yields about 0.6 cubic feet, so a cubic yard of 27 cubic feet is about 45 bags. A 60 lb bag yields about 0.45 cubic feet, which is about 60 bags per yard. Bag yield is the manufacturer's figure, and bag concrete is normally used for small jobs only.

Is it cheaper to mix concrete myself?

For small jobs such as a shed base or fence posts, bags can be cheaper than a delivery and a minimum charge. Above roughly a yard, ready-mix is usually faster and more consistent; the break-even depends on the local bag and delivery prices.

Quick calculator

Concrete yard calculator

Enter your slab or footing size to get cubic yards, bags and the installed cost range.

Estimates, not quotes. Based on our October 2026 price index. See the full index.

Sources and method
Installed cost range from the price index (checked October 2026), which compares published national cost guides (HomeGuide, Angi, HomeAdvisor) and supplier list prices. Coverage and volume figures are arithmetic, not estimates. Delivery fees are set by local plants and are covered in the delivery guide. See the methodology.